 |
Electrical Service Installation
Installation of a 800 amp parallel electrical service. These are the 4 - 3 1/2" EMT pipes which will carry the 500 MCM copper wire. Two of the pipes are feeders to the 800 amp disconnect switch, and 2 go to the switch gear.
|  | Wire entering the 800 amp disconnect switch.
|  | 800 amp fusible disconnect switch with wires terminated on the lugs.
|  |
|
|
 |